BRATSK HYDRO / SPECIAL FEATURE

Records & specifications.

Capacity, dam dimensions and generation records: what makes Bratsk HPP remarkable.

4500MW

Installed capacity

The station’s present rated capacity.

7 April 2016. Generator. A later photograph of equipment and structures, rather than a construction-era image.
2016

Generator

7 April 2016. Generator. A later photograph of equipment and structures, rather than a construction-era image.

Сайга · Wikimedia Commons
CC BY-SA 4.0 · Original ↗

Source ↗
18units

Generating units

The last of the eighteen entered service in 1966.

7 April 2016. A generating unit. A later photograph of equipment and structures, rather than a construction-era image.
2016

A generating unit

7 April 2016. A generating unit. A later photograph of equipment and structures, rather than a construction-era image.

Сайга · Wikimedia Commons
CC BY-SA 4.0 · Original ↗

Source ↗
124,5m

Dam height

The height reported by the station’s operator.

18 August 2021. A modern view of the Bratsk dam; not an archival photograph.
2021

The dam decades later

18 August 2021. A modern view of the Bratsk dam; not an archival photograph.

Andrijko Z. · Wikimedia Commons
CC BY-SA 4.0 · Original ↗

Source ↗
924m

River-channel section

Length of the concrete river-channel section, rather than the combined length of the complex’s structures.

7 April 2016. Spillway dam. A later photograph of equipment and structures, rather than a construction-era image.
2016

Spillway dam

7 April 2016. Spillway dam. A later photograph of equipment and structures, rather than a construction-era image.

Сайга · Wikimedia Commons
CC BY-SA 4.0 · Original ↗

Source ↗
1430m

Full concrete dam length

Crest length along the pressure front, as reported by A. N. Semenov. This differs from the length of the river-channel section alone.

7 April 2016. HPP from the right bank. A later photograph of equipment and structures, rather than a construction-era image.
2016

HPP from the right bank

7 April 2016. HPP from the right bank. A later photograph of equipment and structures, rather than a construction-era image.

Сайга · Wikimedia Commons
CC BY-SA 4.0 · Original ↗

Source ↗
225MW

First unit in 1961

Capacity at first commissioning, distinct from the whole station’s capacity today.

1 March 1961. Equipment installation at Bratsk dam.
1961

Hydroelectric equipment

1 March 1961. Equipment installation at Bratsk dam.

Валерий Шустов / Valeriy Shustov · Wikimedia Commons / РИА Новости
CC BY-SA 3.0 · Original ↗

Source ↗
1954–1967years

Main construction period

First power came in 1961; acceptance of the whole complex followed in 1967.

1 February 1960. The Bratsk dam construction site.
1960

Building the Bratsk hydroelectric station

1 February 1960. The Bratsk dam construction site.

Макс Альперт / Max Alpert · РИА Новости / RIA Novosti, № 791507
CC BY-SA 3.0 · Original ↗

Source ↗
Concretegravity dam

Dam structure

A massive concrete dam resists the force of water through its own weight.

10 May 2005. Bratsk HPP, a view from the crest.
2005

The dam in May 2005

10 May 2005. Bratsk HPP, a view from the crest.

A. L. (loading) · Wikimedia Commons
CC BY-SA 4.0 · Original ↗

Source ↗

Capacity and energy measure different things

Megawatts (MW) measure power: how much the station can supply at a moment. Kilowatt-hours (kWh) measure energy generated over time. The 4,500 MW figure is the station’s power capacity; a trillion kWh is generation accumulated over years of operation.

Three measures of scale

1966–1971

The world’s largest hydroelectric station

Following the eighteenth unit’s start on 14 December 1966, Bratsk became the world’s largest hydroelectric station by installed capacity. It retained that position until Krasnoyarsk overtook it in 1971.

1 March 1960. Building the Bratsk dam.
1960

Construction panorama

1 March 1960. Building the Bratsk dam.

Макс Альперт / Max Alpert · Wikimedia Commons / РИА Новости
CC BY-SA 3.0 · Original ↗

Системный оператор ЕЭС · пуск и мощность / First power and capacity ↗
Contemporary profile

Russia’s third-largest by capacity

The Hydropower of Russia Association lists Bratsk as Russia’s third-largest hydroelectric station by installed capacity. Station profile checked on 18 October 2026.

7 April 2016. The powerhouse. A later photograph of equipment and structures, rather than a construction-era image.
2016

The powerhouse

7 April 2016. The powerhouse. A later photograph of equipment and structures, rather than a construction-era image.

Сайга · Wikimedia Commons
CC BY-SA 4.0 · Original ↗

Ассоциация «Гидроэнергетика России» · паспорт и история / Station profile and history ↗
Sources and dates

Information checked on 18 October 2026. Photograph dates appear in captions.